
|
Area Requiring | Time Frame To Apply Erosion Controls |
|---|---|
| Any ares that will lie dormant for one year or more | Within seven days of the most recent disturbance |
| Any areas within 50 feet of a surface water of the State and at final grade | Within two days of reaching final grade |
| Any other areas at final grade | Within seven days of reaching final grade within the area |
|
Area Requiring | Time Frame To Apply Erosion Controls |
|---|---|
| Any disturbed areas within 50 feet of a surface water of the State and not at final grade | Within two days of the most recent disturbance if the area will remain idle for more than 21 days |
| For all construction activities, any disturbed areas that will be dormant for more than 21 days but less than one year, and not within 50 feet of a surface water of the State |
Within seven days of the most recent disturbance within the area For residential subdivisions, disturbed areas must be stabilized at least seven days prior to transfer of permit coverage for the individual lot(s) |
| Disturbed areas that will be idle over winter | Prior to the onset of winter weather |
Where vegetative stabilization techniques may cause structural instability or are otherwise unobtainable, alternative stabilization techniques must be employed.
Additional information can be found on the EPA website at:
http://www.epa.state.oh.us/dsw/permits/gpfact.aspx
Ohio Department of Natural Resources RLMD Manual at:
http://www.dnr.state.oh.us/tabid/9186/default.aspx